Due to flooding in periods of heavy rain, a culvert that ran underneath the busy A19 trunk road and through the grounds of Melkridge Hall required upgrading. To facilitate the work, it was decided to install a new drainage system with increased capacity underneath the adjacent public footpath.
To manage the volume of water, it was decided to lay three 600mm diameter twin wall plastic drainage pipes embedded in concrete.