Due to flooding in periods of heavy rain, a culvert that ran underneath the busy A19 trunk road and through the grounds of Melkridge Hall required upgrading. To facilitate the work, it was decided to install a new drainage system with increased capacity underneath the adjacent public footpath.
![](https://st-astier.com/wp-content/uploads/2021/11/Melkridge-3-1024x768.jpeg)
To manage the volume of water, it was decided to lay three 600mm diameter twin wall plastic drainage pipes embedded in concrete.